Alliance Machine Systems International, LLC
NewsContactCompanyServiceConferenceHome

Corrugated Products

 

Specialty
Folder Gluers

Robotics

Prefeeders

Counter Ejectors


RDC Stackers

Bundle Breakers
& Separators

Bundle Handlers


Load Formers
& Palletizers

Pallet Handlers


Stack Handlers


Glue Prep Systems

Special Equipment

 

Custom Automation

 
   
  

SAFETY BULLETIN 

Bulletin number: SB104 - A1

Category: Safety

Date issued: August 22, 2003

Machine models: TEI¨ Prefeeders manufactured prior to 1998

Back to Index

Refer to SB104 section 1 on page 2.   Please do the following if your extendo acme nut mount is a two-bolt design as shown in the figure below:
 Replace Part # 0015064
With 1023222 and
1023223
 Replace Part # 0018546
With 1023451 and
1023416
 Proper Four Bolt Mount

Figure 1.  Extendo Power Adjust Nut Retainer Mounts

Replace the two bolt extendo power adjust mount with a four bolt mount.  The mount should be installed with four grade 5, 3/8” UNC bolts and lock washers.  The Acme rod plastic nut fits inside the mount and the mount cover and the mount are bolted to the extendo frame.  Torque the bolts to 33 ft/lbs.

If you need assistance or would like to purchase replacement parts, please call Gary Kneale, Field Service Manager, at 509-535-0356 and select Option two.

Back to top

Back to Index